Electrical conduit work continuing at intersection of North College and Main. We hope to cross North College today.
On the South side we will be pouring sidewalk and flume at Catherine and Main today. That sidewalk should be open by 5:00 pm. A small pour on the flume at College and Main today also.
Hutch-n-Son Construction
Recent Posts