Today we plan to pour some sidewalks between Catherine and Spring Streets. We also have to close Main between Spring and Ann to install some Electrical Conduits. This is our last closure between Spring and Ann. Sorry for the inconvenience. We will be doing some curb and sidewalk cleanup from the Asphalt operation between Tugaloo and Catherine.
If the predicted rain does not come we will be doing striping of the parking areas and the road system Tuesday. Some blockage of parking areas will occur.
Hutch-N-Son Construction
Recent Posts